Order. Install. Live with Basis.
Step by step walkthrough on what getting Basis looks like, what to expect from day one, week one, and many months ahead.
Order
Get quote
Confirm details
The call usually takes under five minutes.

Site visit (optional)
Book your install
Install
Site preparation
Site prep is the biggest source of timing variability, typically 1–4 hours.

Install Basis Board
Basis drops into the same wall studs as the combi-board most NZ homes already have, and your sparky configures each circuit through the Basis Trade App.
See the Basis BoardTypically 1–2 hours from mount to circuits configured.
Safety scan

Tidy up
Typically 30 minutes from final commission to handover.
Live with Basis
Day 1
Connect your panel to wifi, name each circuit, set your notification preferences, and configure routines. Basis is already running on the wall. This is where it becomes yours to drive.
See the Basis Home App
Week 1
Every circuit is revealed. 10,000 readings a second on each one.

Month 1
Tariff check runs weekly. Every market change is re-priced against your home.
Month 6
Size your electricity needs with precision.

Ongoing
Always improving. Every fleet update lands on your Basis Board automatically at no cost.