Build all-electric homes on the supply you've already got.

When a home nears its 63A limit, the Basis Board puts low-priority circuits like hot water and EV charging on standby, then switches them back on when there's room. No supply upgrade, no extra hardware, and the main switch doesn't trip.

I'm adeveloper or builderelectricianliving in a Basis home

Whole-home load

59 A of 63 A supply

020406380 A
  • EV charger24 AOn
  • Oven13 AOn
  • Heat pump9 AOn
  • Other circuits13 AOn
  • Hot water15 AStandby

The challenge

All-electric homes are outgrowing their connection.

Calculated demand for a modern all-electric home1
80A
The single-phase supply most homes actually have. If it's exceeded, the main switch trips and the whole home goes dark.
63A
Sampled homes that would have needed to pause a circuit at a 60A limit2
1 in 51

Calculated demand assumes everything runs at once. Real peaks are rare and short, so managing them costs far less than upgrading for them.

Compare

Three ways to handle the extra load.

You could pay for more supply, fit a separate load controller, or use the switchboard you were installing anyway.

CompareUpgrade the supplyAdd a load controllerBasis Board
Cost per home$3,250–$9,900 lines-company contribution, before civils and labour 3Extra device, wiring and install timeBuilt into the board
Extra hardwareNew service feed, sometimes a transformerController, contactors and current sensorsNone. Every circuit is already measured and switchable.
Loads it managesNot applicableUsually one or two dedicated loadsAny circuit in the board, in your chosen order
Homeowner sees whyNot applicableRarelyYes, in the Home App
Changing it laterA new application and quoteA site visitRemotely, by Basis support

How it works

Your electrician picks the order. The Board does the rest.

  1. 01WatchMeasures the current on every circuit, all the time, and how close the home is to its limit.
  2. 02PauseOn a sustained overload, puts the first circuit in the list on standby, then the next if needed.
  3. 03WaitKeeps paused circuits off for at least a few minutes, which protects appliances like heat pumps from being switched on and off too often.
  4. 04RestoreBrings circuits back one at a time, in reverse order, once there's room.

Try it. Turn things on.

Interactive

Tap any circuit to switch it on or off, and watch what the Board does.

Whole-home load with Basis

31A

With Basis31A · Power on
Without load limiting31A · On

All good. 32A of headroom. Try turning on the ev charger.

A simplified illustration. The real Basis Board waits for a sustained overload before acting, keeps paused circuits off for a minimum time, and staggers restores so the load can settle.

See it in your development →

Reliability

Decided on the board. No internet needed.

  • Decisions are made on the Board in real time. The cloud only stores settings.
  • Acts in seconds, with no round trip to a server.
  • Settings stay with the circuit position if a module is replaced.
  • Basis support can update settings remotely when a site needs it.

For developers & builders

Every lot all-electric. No supply upgrades.

Spec EV chargers, heat pumps and induction as standard, and keep each home on its existing 63A supply. Load limiting is part of the Basis Board, so there's nothing extra to buy, install or explain.

  • Skip the supply upgrade on every lot
  • Homeowners see why a circuit is paused, so you get fewer callbacks
  • Your electrician sets the order at commissioning
  • Basis support can see limiting activity and change settings remotely
Lot 148A● On
Lot 261A● Hot water on standby
Lot 322A● On
Lot 435A● On
Lot 517A● On
Lot 641A● On

Every lot on a 63A supply. No upgrades.

For electricians

Your order. Set up in minutes.

Turn on load limiting during commissioning in the Basis Trade App. We suggest an order based on your circuit labels. Drag to adjust it to the site, sync, and you're done. No internet connection needed.

  • Suggested order from circuit labels: hot water, underfloor heating, towel rails, heaters, pool, spa, EV charger, air con
  • Any configured circuit can be included. Leave essentials off the list.
  • The order follows circuit position, so swapping a module won't break it
  • Circuit pages show when a circuit is in the order, so you won't miss it when making changes
Load limiting

Paused first at the top. Restored in reverse.

  1. 1Hot water · C4
  2. 2Underfloor heating · C9
  3. 3Towel rail · C11
  4. 4EV charger · C2
  5. 5Heat pump · C6
Capacity rating63A

For homeowners

Never wonder why it's off.

If a circuit is paused, the Basis Home App tells you which one, why, and what to switch off to get it back sooner. You can see your live load against your limit, and the full order your electrician set up.

  • Clear standby status on every paused circuit
  • Live amps for each circuit, so you can spot what's using the most
  • Your priority order, with the names you already know
  • Nothing to set up. It just works in the background.
6:42

Load limiting

Hot waterStandby

Paused by load limiting. Your home is close to its 63A limit. Turning off something on another circuit, like the oven or dryer, will bring it back on sooner.

Home load59A / 63A

Biggest users right now

EV charger24A

Oven13A

Heat pump9A

Before load limiting, homeowners did this by hand.

“Now, with the Basis app I monitor my real-time use and set circuits to stand-by so my peak demand stays within my 63A capacity. Paying $4.5k for the Basis Board saved me $10k in a network upgrade I was being forced to do.”

James G.Homeowner, Tauranga

Now the Basis Board does it for you, automatically.

Good to know

Convenience, not protection.

Load limiting keeps your home running. Your main switch and circuit protection keep it safe. They do different jobs.

What load limiting does

Keeps the home's load under its limit by briefly pausing circuits you've agreed to, so the main switch rarely trips.

What it doesn't do

It doesn't replace the main switch or any protective device. Your electrician designs the installation, confirms it meets the wiring rules, and signs it off.

FAQ

Questions.

Most of the time, no. Load limiting only steps in when lots of appliances run at once. When it does, a low-priority circuit like hot water pauses for a few minutes and then comes back on by itself.

  1. Calculated demand for homes in a current Basis development, compared with a 63A single-phase main switch.
  2. Analysis of 51 randomly sampled Basis Boards in New Zealand, modelled at a 60A limit.
  3. Lines-company capital contribution from Unison and Powerco 2025/26 schedules. Excludes service feed, civils, switchboard and labour.
  4. Load limiting is not a protective device. Installations must meet AS/NZS 3000 and be certified by a licensed electrician.